Installing an air conditioning unit on the façade requires the authorisation of the owners’ meeting, under Article 7 of the Horizontal Property Law (LPH). The reason is that the façade is a common element of the building, as set out in Article 396 of the Civil Code, and no neighbour can act on it alone.
Article 7.1 of the LPH allows the owner of each flat or commercial unit to modify the architectural elements, installations or services of their property, provided this does not impair or alter the building’s safety, general structure, or exterior configuration or condition, and does not harm the rights of another owner. They must also notify the community’s representative of such works beforehand. In the rest of the building they may not make any alteration and, if they notice the need for urgent repairs, they must report it to the administrator without delay.
One lawyer sums it up this way: “Article 7 prohibits owners from making any alteration, whether to common or private elements, as long as the building’s appearance is altered.” The aim of the rule is to protect architectural harmony and prevent unilateral decisions that affect the community.
The façade is a common element: what the Civil Code says
Article 396 of the Civil Code defines the building’s common elements as including, among others, the façades, with the exterior coverings of terraces, balconies and windows, and it includes their image or configuration. That is why drilling into a wall or fitting metal brackets alters the configuration and visual appearance of the building, and anything done to the façade needs the approval of the owners’ meeting.
Fitting these units on the façade or on other common elements without prior authorisation breaches the LPH and can force you to remove them and pay for the subsequent works.
What majorities the community requires: 3/5, unanimity and aerothermal systems
As a general rule, Article 17.4 of the LPH requires the favourable vote of 3/5 of all owners, who must also represent three fifths of the ownership shares, to modify the façade and install elements not provided for. Article 17.6, by contrast, requires unanimity of all owners, representing all of the ownership shares, when an agreement not expressly regulated involves approving or changing the rules of the constitutive title or the statutes. The applicable majority therefore depends on the type of agreement; if in doubt, it is advisable to consult the property administrator or a lawyer.
Article 10 of the LPH regulates compulsory works and actions on accessibility, general maintenance or energy efficiency, but a unit for individual use is not a compulsory work under that article.
Since Royal Decree-Law 7/2026, Article 17.1 includes aerothermal and geothermal systems among the common or private renewable energy systems whose installation can be agreed, at the request of any owner, by one third of the members of the community representing one third of the ownership shares. The law does not make clear whether a conventional air conditioning unit can benefit from that regime, so the prudent course is to seek advice before installing.
Exceptions: pre-installation, private balcony and tolerated units
If the building was constructed with a prior pre-installation, the appearance is not affected and a unanimous agreement is not needed. However, you must use that pre-installation: it does not authorise placing the unit anywhere on the building.
When the outdoor unit sits inside a private balcony or terrace and does not rise above the railing, it is not considered an alteration of the façade’s appearance. One lawyer puts it this way: “This prohibition will have exceptions as long as you are going to install your unit in a private area that does not alter the common elements of the community of owners.”
Nor do the courts treat an unused light well in the same way as a visible inner façade that looks like a main one: the outcome depends on each building and on how the unit is installed. If there are already several similar units on the same façade and the community has tolerated them, it may be difficult to demand the removal of another, provided the units are similar and the community knew about them.
How to request authorisation from the owners’ meeting
The owner can send a letter to the president, or to the administrator if they perform that role, specifying what they are asking for. It is advisable to give details of the exact location of the outdoor unit, whether the façade will be drilled, the type of fixing and the dimensions of the unit.
The president must include the request on the agenda of the next meeting, under Article 16.2 of the LPH. The agreement is adopted by the relevant majority and must be recorded in the minutes.
What to do if the community refuses: deadlines to challenge
If the community refuses without good reason, the agreement can be challenged in court when it is contrary to the law or the statutes, seriously detrimental to an owner who has no obligation to bear it, or adopted through an abuse of rights (Article 18.3 of the LPH).
The deadline is three months from the agreement, or one year if it is contrary to the law or the statutes. To challenge it, you must be up to date with payments, under Article 18.2.
What happens if the unit is already installed
The community can approve it afterwards if it obtains the required majority, although it is under no obligation to do so. Until it is approved, the installation breaches the LPH and the community can demand its removal and the restoration of the façade.
Magazine3 days agoWashing machine smells? Clean the seal and leave the door open
Robot aspirador7 days agoDreame robot vacuum error codes: causes and fixes
Robot aspirador7 days agoRoborock error codes: what they mean and what to do
Magazine7 days agoXiaomi launches Mijia home appliances in Spain: prices
Magazine6 days agoEU Right to Repair Directive: What Manufacturers Must Now Do
Junkers6 days agoWhy your Junkers water heater will not ignite and what to check
Boiler7 days agoBoiler leaking underneath: causes and what to do
Magazine4 days agoPellet stove shutting down: causes and safe checks
Magazine6 days agoUnderfloor heating not warming up: causes and safe checks
Magazine5 days agoEU E-Waste Levy Could Cost Spain Over €1,800 Million a Year
Magazine7 days agoMehmet Tüfekçi named new managing director of Beko Europe in Spain
Magazine5 days agoPellet stove won’t start: causes and safe solutions